Updated worldwide glass market study 2024 available now for flat, container glass and tableware

We have updated our international studies on flat glass, container glass and tableware for 2024.

This unique software provides a global overview about glass producers and technical details. Easy to use and clear tables summarize information and data about glass makers such as: Glass types: flat glass, container glass, tableware, production capacities in regions and countries, number of furnaces, furnace types, year of construction, glass types and sub-types, products, project information, special news and downloads.

Further databases supplying demoscopic data and import and export data complete the market survey. Based on these data, prepare individual country profiles with information about local production capacities, local market sizes and expected demand in the future.

Request your offer via plants.glassglobal.com.

Updated container glass study 2024

X

Updated float glass study 2024

X

Further glass studies and reports 2024

X

Liste d´entreprises

INFO

Voici les informations fondamentales de l´entreprise. Cette entreprise a préparé d´autres informations f.ex le site internet, numéros de téléphone, télecopie, contacts, histoire et données géneriques.

Afin de recevoir ces informations en ligne ou pour les avoir imprimés, il faut avoir un "Profile Access" à glassglobal.com valide. Voir conditions ici:  Price Info .

login



Contact

Adresse Calyxo GmbH
OT Thalheim
Sonnenallee 1a
06766 Bitterfeld-Wolfen
Pays Allemagne
E-mail Get in contact with Calyxo GmbH

Produits ou Machines

Established in 2005, Calyxo GmbH produces thin-film modules based on a Cadmiumtelluride-(CdTe-)Technology. Originally Calyxo had attained a worldwide exclusive licence for a highly innovative glass coating technology from the US company Solar Fields. Calyxo initially set up a pilot line with a production capacity of 8 MWp in Bitterfeld-Wolfen/Thalheim (Germany) to show that the technology could be transferred to mass manufacturing and rapidly commercialised. The pilot line was set into operation in summer 2007.